Code Compliance & Legalization

Unpermitted work blocking your sale, refinance, or rental? We investigate, document, and legalize unpermitted additions so you can move forward — without demolition.

3-Phase Legalization Process

01

Investigation & Documentation

  • Site investigation & measurement
  • As-built drawings
  • Code violation assessment
  • Historical permit research
  • Legalization strategy
02

Remediation & Plans

  • Code correction design
  • Structural analysis (if needed)
  • Title 24 energy compliance
  • Stamped construction documents
  • Permit application preparation
03

Permit & Approval

  • Retroactive permit submittal
  • Plan check response
  • Correction coordination
  • Final inspection
  • Certificate of Occupancy
Real Results

Success Story

Code Compliance  ·  Legalization

Unpermitted 800 sqft Addition
— Fully Legalized, No Demolition

Camarillo, CA  ·  Residential
The Situation

Homeowner was blocked from refinancing due to an 800 sqft room addition built in 2009 — never permitted. Two contractors told them demolition was the only option. They came to us as a last resort.

Fully legalized via as-built drawings and retroactive permit. No demolition required. Refinancing completed in 14 weeks from first call.

14
weeks
Start to finish
$0
 
Demolition cost
 
Legally permitted

Investment

Price varies based on addition size, complexity, and required corrections. Free consultation to assess your specific situation.

Ready to Legalize Your Unpermitted Work?

Get a fixed-fee legalization proposal in 24 hours